What We Do

Services

The full list of deck work we take on, from new builds to repair.

Home › Services

Everything we take on

Every job below is one we do ourselves across Fairhope.

Deck Installation

We build decks from the footings up, sized to span your yard and tied into the house with a properly flashed ledger board. Joists get hung 16 inches on center as standard, tighter if you're going with composite decking, and every post sits on a poured concrete footing set to local code depth.

Deck Repair

Soft or bouncy decking usually means a joist has rotted from the top down where water's been sitting under the boards. We pull up the bad sections, check the frame underneath for termite damage, which is common this close to the water, and replace only what's actually failed instead of tearing off a whole deck that's mostly fine.

Deck Staining & Sealing

Pressure-treated pine has to dry out for a few weeks before it'll take a stain, and we check moisture content with a meter before we start instead of guessing. We pressure wash first to strip old finish and mildew, then apply a penetrating sealant rated for UV and standing water, since Gulf Coast sun breaks down a cheap topcoat fast.

Custom Deck Design

Multi-level decks, built-in benches, and stairs that land where you actually want them, laid out before any lumber gets cut. We'll walk the site with you and talk through sun exposure and sightlines, not just square footage.

Composite Decking Installation

Composite boards like Trex or TimberTech don't splinter, don't require restaining, and hold up better than pine against the humidity we get here. The tradeoff is cost up front and hidden fastener systems that take more time to install correctly, which we factor into the quote.

Deck Railing Repair & Installation

Baluster spacing has to pass a 4-inch sphere test under most residential codes, and a lot of older decks around here don't meet it. We rebuild railings to current spacing and anchor posts through the rim joist with bolts instead of screws, because a railing that moves is the first thing an inspector flags.

Deck Board Replacement

Sometimes the frame's solid and it's just the decking on top that's cupped, grayed, or splintering. We match board profile and spacing to the rest of the deck where we can, or resurface the whole top in composite if the old pine's past saving.

Screened Porch Construction

A screened porch built onto or beside an existing deck keeps the bugs out without closing off the space completely. We frame it to carry a roof load, not just a screen, so it can take a storm without the frame racking.

Pergolas & Covered Decks

A pergola or shade structure over part of the deck cuts down on how much direct sun the boards take, which slows fading and cupping. We size the posts and beams to actual wind load, not just looks, since we're in a hurricane zone.

Deck Footing & Structural Repair

A deck that's pulled away from the house or leans to one side usually comes down to a footing that was never poured deep enough or a ledger board that was only nailed instead of bolted. We dig out and re-pour footings, through-bolt the ledger into the rim joist, and flash it so the fix outlasts the original build.

How It Works

Four steps, and no surprises in any of them.

01

We come and look

You tell us what you want doing, we look at what is actually there, and we ask the awkward questions early.

02

You get a price

In writing, itemised, free. If something might add cost later we flag it now rather than at the end.

03

We do the work

Same crew throughout. We cover your floors, keep the dust down and tidy up before we leave each day.

04

We walk it with you

You point out anything you are not happy with and we fix it before the invoice, not after.

Where We Work

All of this, across Fairhope, AL

We'll drive out to quote any of these towns in person before work starts.

Fairhope, AL
Mobile, AL
Daphne, AL
Foley, AL
Gulf Shores, AL
Spanish Fort, AL
Bay Minette, AL
Robertsdale, AL
Orange Beach, AL
Loxley, AL
Silverhill, AL
Summerdale, AL
Common Questions

Things worth asking

Questions that come up once a deck project is actually underway.

Do I need a permit to build a deck?
Most counties require a permit for a deck attached to the house or built more than 30 inches above grade, and Baldwin County is no exception. A deck builder should pull this permit as part of the job and schedule the footing and framing inspections that come with it.
How long does it take to build a deck?
A standard single-level deck usually takes one to two weeks from footings to final board, weather permitting. Multi-level decks, built-in seating, or a screened porch added on top extends that timeline since each adds its own framing and inspection step.
Can you build a deck to fit a specific budget?
Deck size, decking material, and railing style are the three variables that move cost the most, so a contractor can adjust any of those to fit a stated budget. Pressure-treated pine with a simple rail design costs significantly less than composite decking with cable rails covering the same square footage.
What kind of guarantee comes with a new deck?
A deck builder typically guarantees workmanship for a set period, separate from manufacturer warranties on the lumber or composite decking itself. Composite brands like Trex and TimberTech usually carry their own 25-to-50-year material warranty handled directly with the manufacturer.
Will I deal with the same person throughout the project?
On most deck jobs, one crew lead handles the day-to-day work and is the main point of contact for questions once construction starts. That's often different from the person who gave the original estimate, so it's worth confirming who to call once the job is underway.
What decking material options are available?
Pressure-treated pine, cedar, and composite decking are the three most common choices, each with different costs and upkeep. Pine is cheapest but requires restaining every two to three years in a humid climate, while composite costs more upfront and mostly needs periodic washing.
Can I still use my yard or house while the deck is being built?
Deck construction is mostly exterior work, so a house stays fully livable during the project with some noise during framing and cutting. Yard access near the build site is usually limited for safety while footings are poured and lumber is staged.
What should I do to prepare the site before deck construction starts?
Clearing furniture, grills, and potted plants away from the existing deck or build area lets a crew get footings and framing done without working around obstacles. Marking any buried sprinkler lines or underground utilities near the planned footing locations also speeds up the permit inspection.
What happens if you find rot or termite damage once the old deck is torn off?
Hidden rot or termite damage in the rim joist or band board is common once old decking comes off, especially in humid coastal climates, and it changes the scope of the repair. A contractor should stop, show the homeowner the damaged framing, and quote the additional repair before continuing instead of building over it.
How do I take care of a new deck once it's finished?
A pressure-treated pine deck should be resealed every two to three years to keep water from getting into the grain, while composite decking mainly requires a seasonal wash to clear pollen and mildew. Keeping planters and grills from sitting directly on the boards for long periods also prevents staining and trapped moisture.

Not sure what you need?

Describe the problem and we will tell you what it probably is. No obligation.

Call (251) 299-0403